Go With Goad
Generated illustration of a tree-lined street of older brick bungalows with small lawns, parked cars and overhead power lines at sunset
Downriver process

Selling a Pre-1978 Downriver Home? The Lead Paint Disclosure

By David Goad · · 6 min read

Does the federal lead paint rule apply to your Downriver sale?

If the house was built before 1978, probably yes. EPA’s Lead-Based Paint Disclosure Rule and HUD’s matching rule cover the sale of “target housing,” which EPA describes as most housing built before 1978.

Start by pinning down the year built. If you’re not sure, check your closing papers from when you bought, an old appraisal or your city’s assessing records, and give your agent the source. If part of the house was built at a different time, ask your agent how to describe it.

A few sales and homes fall outside it. Both rules exclude sales at foreclosure. Both rules’ definition of target housing also leaves out housing for the elderly or people with disabilities, unless a child under six lives there or is expected to, and certain zero-bedroom units. If you think your sale might fit an exception, ask your agent or a real estate attorney before you skip any step.

Treat this as its own set of steps. Both rules also say they don’t relieve a seller or agent of any state or local law on notice or disclosure of known lead-based paint or hazards. So if you’re also working through Michigan’s seller disclosure, our post on when Downriver sellers should hand over the disclosure covers that side. The federal lead paint paperwork runs alongside it.

What do you have to give the buyer, and when?

Four things, and all of them before the buyer is obligated under the purchase contract. Both the EPA and HUD rules list them:

  1. The pamphlet. You give the buyer an EPA-approved lead hazard information pamphlet, such as “Protect Your Family From Lead in Your Home.”
  2. What you know. You disclose any known lead-based paint or lead-based paint hazards in the house, plus what you know about them, such as how you know, where the paint is and what condition it’s in.
  3. Your records. You hand over any available records or reports about lead-based paint or lead hazards in the house.
  4. The signed attachment. The contract gets an attachment with a Lead Warning Statement, your disclosure statement, a list of the records you provided (or a statement that you have none), the buyer’s acknowledgment and signatures with dates.

The Lead Warning Statement is fixed language set out in the rules. It opens: “Every purchaser of any interest in residential real property on which a residential dwelling was built prior to 1978 is notified that such property may present exposure to lead from lead-based paint that may place young children at risk of developing lead poisoning.” It ends by saying a risk assessment or inspection for possible lead-based paint hazards is recommended before purchase. The statement goes in the contract attachment as written.

“Before the buyer is obligated” is the deadline the rules set. Both rules also cover a late start: if any of these steps happens after the buyer has made an offer, you complete them before you accept the offer and give the buyer a chance to review the information and possibly amend the offer. Having the pamphlet and the attachment ready when you list is a simple way to avoid that scramble, so ask your listing agent about it early.

You don’t have to draft the attachment from scratch. EPA says it provides sample disclosure forms, in English and Spanish, that sellers and agents can use. Both rules say the attachment has to be in the language of the contract, so if the purchase agreement is in Spanish, the lead paint attachment is too.

Both rules say nothing in the disclosure section implies a positive obligation on the seller to conduct any evaluation or reduction activities. What they do require is disclosing what you know and providing available records, which both rules define as records in your possession or reasonably obtainable by you. If you had a lead inspection done years ago, or a contractor found lead paint during a project, ask your agent whether that report needs to go to the buyer.

How does the buyer’s 10-day lead inspection window work?

Before the buyer is obligated, you have to give them a 10-day period to have the house inspected or risk-assessed for lead-based paint and lead hazards. Both rules let the two of you agree in writing on a different period, and both let the buyer waive the opportunity in writing.

That window changes how you read offers. A buyer who keeps the full 10 days can test for lead before being locked in. A buyer who waives it in writing takes that step off the table. Neither is automatically better for you. Look at how the offer handles the window next to the price, the financing and the closing date, and ask your agent how the purchase agreement words it. Questions about what the contract language does belong with a Michigan real estate attorney.

Honestly, the window is easier to handle when you’ve already gathered what you know. If you’re aware of chipped paint on the porch or old test results in a drawer, talk with your agent about how they go on the attachment before you list.

If you think a buyer will test, it helps to know the house first. Walk it and look for peeling, chipping or cracked paint before you list. Note what you find and where, so you can answer your agent’s questions accurately.

Should you repaint before you list?

Maybe, but hire carefully. Scraping and painting is a normal pre-listing job, and in a pre-1978 house it can disturb lead paint. EPA says firms doing renovation, repair and painting projects that disturb lead-based paint in homes built before 1978 must be EPA- or state-certified and must use certified renovators who follow specific work practices. EPA’s renovation rule, 40 CFR Part 745, Subpart E, sets those certification and work practice requirements, with limited exceptions.

So before you hire a painter or a handyman for a pre-1978 house, ask three questions:

  • Is your firm certified for lead-safe renovation work, and can I see the certificate?
  • Will a certified renovator direct this job?
  • Will you test the painted surfaces first, or treat them as lead paint?

Keep the answers and the invoice. If a contractor tests surfaces or finds lead paint during the job, ask your agent whether that paperwork is an available record or report you need to provide under the disclosure rules.

What do you and your agent owe the buyer?

Your agent has a job here too. Both rules say each agent has to make sure the rule is followed. That means telling you about your obligations, and then either making sure you’ve done them or handling compliance personally.

Both rules also say that an agent who has informed the seller of these obligations isn’t liable for the failure to disclose lead-based paint or hazards the seller knew about but didn’t disclose to the agent. So when your agent asks about past paint work, inspections or test results, give a full answer.

Both rules also set penalties. They say a person who knowingly fails to comply can face civil money penalties, and that a person who knowingly violates the rule is liable to the buyer for three times the damages the buyer suffered.

After closing, keep the paperwork. Both rules say the seller and any agent keep a copy of the completed attachment for no less than three years from the date the sale closes.

Here’s a simple way to keep the whole thing on track from listing to closing:

  • Before listing: find the year your house was built, pull any old lead reports and get the pamphlet and the attachment ready.
  • At the offer stage: ask your agent how the attachment, the buyer’s acknowledgment and the 10-day window, a different agreed period or a written waiver are being handled in the deal, and take contract questions to a Michigan real estate attorney.
  • After closing: save a copy of the signed attachment with your closing papers for at least three years.

Lead paint isn’t the only lead question an older Downriver house can raise. Buyers may also ask about the water service line, and our post on lead water service lines in Downriver homes covers that side from the buyer’s view.

If you’re getting the rest of the house ready too, our guide to preparing a Downriver home for sale walks through the other steps, and what happens after an offer is accepted in Michigan covers the stretch between signing and closing.

Frequently asked questions

What counts as lead-based paint under these rules?

EPA's and HUD's rules both define it as paint or other surface coatings with lead at or above 1.0 milligram per square centimeter or 0.5 percent by weight.

Does the buyer's agent have the same duties as my listing agent?

Not necessarily. Both rules define an agent as someone who contracts with the seller or the seller's representative to sell the home, and both say the term doesn't apply to a buyer's representative who receives all compensation from the buyer.

Does the rule cover a pre-1978 condo?

Usually, yes. Both rules define target housing as any housing built before 1978, with exceptions for housing for the elderly or people with disabilities and zero-bedroom units. EPA says the disclosure rule applies to most pre-1978 private housing.

When did these rules start applying to home sellers?

Both rules say the requirements took effect on December 6, 1996, for owners of one to four residential dwellings, and on September 6, 1996, for owners of more than four.

Sources

Ready to talk strategy? Call David Goad at 313-319-7688.

If you want to dig deeper into the local market, check out the Downriver MI Real Estate Guide. And if you want to get a better feel for who I am and how I work, here's the About David Goad — Downriver Realtor page. If you're comparing agents and trying to figure out who really knows this market, this page on the best Realtor in Downriver MI gives you more context too.

Read next

More from Downriver

Selling a Downriver Home With an IRS Tax Lien?
Downriver 11.12.26

Selling a Downriver Home With an IRS Tax Lien?

You can sell a Downriver home that has an IRS tax lien on it, but the IRS's claim has to be addressed in the sale. Here's how a release and a certificate of discharge work, what the IRS asks for and what to ask your title company before you list.

Underwater on a Downriver Home? How a Short Sale Works
Downriver 11.10.26

Underwater on a Downriver Home? How a Short Sale Works

If your Downriver home is worth less than you owe, a regular sale can't pay off the mortgage on its own. A short sale can, but only if the servicer agrees. Here's how it works, what to get in writing and what to ask before you list.

Need a straight answer?

Ready to take the next step?

Buying, selling, or stuck between both. Send the address, the city, or the question you keep circling. David responds same day during business hours with the next practical step.