Fixing Up a Gibraltar Home to Sell? Which Jobs Need a Permit
Does Gibraltar inspect a house before it’s sold?
Yes. The city has a Sale of Property application for a certificate of approval. The application lists a $225 resale inspection fee, and the city’s 2025 fee schedule lists the property transfer inspection at $225 as well.
That inspection is why the order of your fix-up list matters. The sale application carries the city’s general property maintenance checklist, the same checklist the building department posts on its own for rental and sale inspections. So the inspector is looking at the house against a list you can read ahead of time.
If you’ve sold a home in another Downriver city, don’t assume the steps line up. Our Flat Rock resale inspection post covers that city’s own process, forms and fees. This one is about Gibraltar’s paperwork, and specifically about the permit side of getting ready.
What happens to work that was done without a permit?
It can get permitted and inspected after the fact, at your cost. Under “Building Permits Required,” the checklist on the sale application and the stand-alone checklist both say new installations without a permit shall be retroactively permitted and inspected at the owner’s expense after repairs, when the building official deems it necessary.
That line is the reason to sort your fix-up list before you start. A new water heater you put in yourself last year, or one you’re planning to swap before listing, isn’t just a chore. If it needed a permit and didn’t get one, the sale inspection is where it can come back to you, with permit fees and an inspection attached.
If you’re thinking about doing the work yourself to save money, read the signature block first. The mechanical and electrical permit applications both quote Section 23a of the state construction code act, which bars anyone from conspiring to get around the state’s licensing requirements for people doing work on a residential building, and both say violators face civil fines. The homeowner affidavit, printed on the electrical application and reprinted on the mechanical form, is for electrical work you install yourself in the home you live in or are about to occupy.
Honestly, before listing is the time to deal with it. You control the schedule now. Once you have a buyer and a closing date, you don’t.
Which fix-up jobs need a permit in Gibraltar?
Mechanical and plumbing work are two places where the city’s own forms spell out the permit costs. The 2025 fee schedule and the mechanical permit application both list these mechanical items:
| Mechanical item | Fee |
|---|---|
| Water heater | $30 |
| Heat exchanger replacement | $40 |
| Heating system, input up to 75,000 | $50 |
| Gas piping and re-piping | $35 |
| Chimney liner | $30 |
Those are item fees. Both documents say every application also includes a $75 application fee and a $50 city admin fee, and that one final inspection is included. So a water heater permit by itself works out to $155 before any re-inspection.
If you hire a contractor, the same fee pages list a $15 contractor registration fee. Ask the contractor to pull the permit, to tell you when the final inspection is booked and to give you a copy of the approval for your file.
Plumbing has its own permit. The fee schedule and the plumbing permit application both list the same $75 application fee and $50 admin fee, a $50 re-inspection fee and $8 for each fixture, floor drain, special drain or water-connected appliance.
Electrical work is the third. The fee schedule and the electrical permit application list the same $75 and $50 base fees, then item fees like these:
| Electrical item | Fee |
|---|---|
| Lighting fixtures and outlets, including receptacles and wired smoke detectors | $6 each, $30 minimum |
| Dishwasher, microwave or garbage disposal | $15 each |
| Power outlet for a range or dryer | $15 |
| First circuit | $25 |
| Each additional circuit | $5 |
| Service through 200 amps | $40 |
So even a small electrical job, say five light fixtures and one new circuit, starts at $180 in city fees once the $75 and $50 base charges are in. That’s worth knowing before you promise a buyer new fixtures.
Don’t let a permit sit, either. The mechanical and electrical applications both print the code’s expiration rule: a permit becomes invalid if the work doesn’t start within 180 days after it’s issued, or if the work is suspended or abandoned for 180 days after it starts. The building official can grant extensions in writing.
Some jobs don’t need a permit at all. The city’s list of residential work exempt from permits and its accessory structure guide both say a one-story detached accessory structure of 200 square feet or less doesn’t need a building permit.
Anything bigger, like a deck or an addition, is worth a call to the building department before you build, so you know whether a permit and which inspections apply.
What does the sale inspection look for while you’re fixing things?
Several checklist items may already be on your fix-up list. The checklist on the sale application and the stand-alone checklist both include:
- Smoke alarms in each sleeping area, outside sleeping areas and on every floor including the basement, with the unit expiration date checked.
- Carbon monoxide alarms near sleeping areas in homes with fuel-fired appliances or attached garages.
- Hot water tepid at the tap and not over 120 degrees.
- A temperature pressure relief valve installed, and fuel-fired appliances properly vented.
- A furnace safety clean and check of the heat exchanger by a licensed contractor every five years.
- Sump pumps working and not connected to the sanitary sewer.
- GFCI outlets where required, and outlet and switch cover plates in place.
- A dryer vent of smooth wall aluminum or another approved material, on its own vent routed outside.
The dryer vent is one item the city spells out on a separate sheet. Gibraltar’s dryer exhaust requirements say the exhaust duct needs a smooth interior finish and has to terminate outside the building, which lines up with the checklist’s smooth wall, routed-outside rule. Check yours against both before the inspector does.
The checklist covers the outside too. It asks for concrete porches, steps, driveways and walkways in good repair and free of safety defects, a roof and gutters free of defects, grass six inches or shorter, noxious weeds handled and no junk, debris or unlicensed, inoperable vehicles in the yard. Put them on the same list and work them in the weeks before the inspection.
Some of those may be small fixes. Others, like replacing a water heater, are on the city’s permit fee list. Walk the list against your house before you call a contractor.
How should you plan the work before listing?
Here’s the order I’d use:
- Pull the checklist from the city’s Sale of Property application and walk your house with it.
- Sort each item into no-permit work and permit work. When you’re not sure, call the building department before you start.
- Ask about past work. If anything was installed without a permit, ask the building department how it would handle it before the sale inspection, so the cost doesn’t land late.
- Price the permit jobs with the fee schedule, plus your contractor’s quote.
- Book the sale inspection with enough time to fix what it finds. The city lists the fee at $225.
- Keep the paperwork. Permits, final inspections and the furnace check report are all things a buyer’s side may ask to see.
If the list is long and the budget is short, you don’t have to fix everything before you list. You do want to know which items are permit work and what they cost, so you can decide what to fix, what to price in and what to offer as a credit with real numbers in hand.
For the bigger picture on getting a house ready, see our guide to preparing a Downriver home for sale, and for weighing repairs against credits, our post on repair credits versus repairs before closing.
Frequently asked questions
Can I pull the permit myself instead of hiring a contractor?
The city's mechanical and plumbing permit applications both have a box for a homeowner applicant as well as a contractor. The homeowner affidavit, printed on the electrical application and reprinted on the mechanical form, covers electrical work the owner installs in the home they live in or are about to occupy. Ask the building department which trades allow it for your job.
Does a small shed in the backyard need a permit?
Not a building permit, if it's a one-story detached shed of 200 square feet or less. The city's list of work exempt from permits and its accessory structure guide both say so. Ask the building department about the zoning rules before you put one up.
What does a re-inspection cost if a permit job fails?
The city's 2025 fee schedule and its mechanical and plumbing permit applications each list a $50 re-inspection fee. One final inspection is included in the permit.
Who checks the furnace for the sale inspection?
A licensed contractor. The sale inspection checklist calls for a furnace safety clean and check of the heat exchanger by a licensed contractor every five years, and the sale application's checklist carries the same item.
Sources
- City of Gibraltar, Sale of Property Application for Certificate of Approval
- City of Gibraltar, Rental and/or Sale Housing Inspection General Property Maintenance Checklist
- City of Gibraltar, Building Department Fee Schedule (approved by council February 24, 2025)
- City of Gibraltar, Mechanical Permit Application
- City of Gibraltar, Plumbing Permit Application
- City of Gibraltar, Electrical Permit Application
- City of Gibraltar, Dryer Exhaust Connection Safety Regulations
- City of Gibraltar, Residential Work Exempt from Permits (January 2024)
- City of Gibraltar, Accessory Structure Guide (January 2024)
Ready to talk strategy? Call David Goad at 313-319-7688.
If you want to dig deeper into the local market, check out the Gibraltar MI Real Estate Guide . And if you want to get a better feel for who I am and how I work, here's the About David Goad — Downriver Realtor page. If you're comparing agents and trying to figure out who really knows this market, this page on the best Realtor in Downriver MI gives you more context too.